The Premier Connection

What to verify at Nora House West Palm Beach: the deposit schedule and the district

Nora House West Palm Beach sells 117 residences before a deposit schedule, a construction loan or a groundbreaking exist in public. The purchase agreement's escrow terms and the district's unbuilt phases decide what a buyer is exposed to until 2029.

Nora House in the Nora District of West Palm Beach
Nora House in the Nora District of West Palm Beach. Rendering courtesy of the developer.
Published entry price
From $2M
Published entry price
A square foot, estimated from the entry price
$1,370
A square foot, estimated from the entry price
Residences
117
Residences
Stage
Now selling
Stage
Developer
The Ronto Group with NDT Development
Developer

The short answer

  • No deposit schedule for Nora House appears on the official site, the sales agent's page or the March 2026 launch release; it lives only in the purchase agreement.
  • Under section 718.202, deposits above 10 percent stay in a special escrow account until construction begins, which the developer anticipates in mid-2027.
  • Completion is slated for 2029, and no construction lender had been announced in the sources reviewed in November 2026.
  • The Nora District's 201-room Nora Hotel opened on October 19, 2026, while 2 more residential phases of about 627 units are still planned around the condominium.
  • Residence sizes on the sales pages are measured to exterior walls and run larger than the interior figures in the condominium documents.

The figures side by side

Nora House
WaterfrontNora District
StatusNow selling
From$2M
Per sq ft$1,370 est.
Interiors1,460 to 6,700 sq ft
Residences117
Floors11
DeveloperThe Ronto Group with NDT Development, Place Projects and Wheelock Street Capital
ArchitectSwedroe Architecture
Flood zoneZone X, minimal flood hazard, outside the Special Flood Hazard Area (FEMA NFHL)

Live from our building files. Est. per square foot divides the entry price by the smallest residence.

Nora House West Palm Beach has not published its deposit schedule

The deposit schedule is the first document a pre-construction buyer should see, and at Nora House it is not public. The official site, the sales agent's development page and the March 2026 launch release all describe residences, amenities and timing. None of them states how much is due at contract or when the next payments fall.

The rest of the offering is well defined. The Ronto Group leads the 11-story building at 1105 North Dixie Highway with NDT Development, Place Projects and Wheelock Street Capital. It holds 117 residences of 2 to 4 bedrooms. Pricing is quoted from the upper $1 millions in the launch release and from the low $2 millions on the official site.

The sales director told WPTV in April 2026 that prices reach roughly $5 million to $6 million and that reservations were in the double digits. A reservation is not a contract. The binding schedule appears only when the purchase agreement is issued, and that agreement deserves a line-by-line reading before any second payment.

Florida law sets the floor under any schedule

Whatever the schedule says, section 718.202 of the Florida Statutes governs the money. The developer must place all payments up to 10 percent of the price in an escrow account. Payments above 10 percent received before construction is complete go into a special escrow account and may not be used before closing, with one exception.

The exception is construction. If the contract allows it, the developer may withdraw the excess once construction has begun, but only for actual building costs. The statute bars its use for marketing, sales commissions, loan payments or legal fees. The contract must carry a bold legend on its first page, above the buyer's signature, saying so.

Two further protections matter. A developer that fails to comply makes the contract voidable, with deposits refunded with interest. Section 718.503 also gives the buyer 15 days after signing, or after receiving the required documents, to cancel. That window is the time to read the escrow agent's name, the payment dates and the outside completion date.

Groundbreaking in mid-2027 keeps most deposits in escrow

Timing turns the statute into a practical finding. The developer anticipates groundbreaking in mid-2027 and completion in 2029. Until construction begins, any deposit above 10 percent cannot leave the special escrow account. A buyer who pays 20 or 30 percent in 2026 is funding an account, not a building.

The dates are not settled. A WPTV report on the district's phases placed the condominium's groundbreaking in late 2027 and its completion in late 2029, later than the developer's figures. No construction loan for Nora House had been announced in the sources we reviewed in November 2026.

That gap is the core risk of an early contract. The deposit is protected by statute, but the household's capital is committed for 3 years or more. The questions are how much the schedule asks before groundbreaking, what the outside completion date is and what refund applies if construction never begins.

The Nora District is open and still being built

The district is the reason to buy here, and its first phases are real. The City of West Palm Beach reported in October 2025 that the North Railroad Avenue district had converted century-old warehouses into more than 100,000 square feet of retail and over 55,000 square feet of second-floor office space.

The hotel followed. The 201-room Nora Hotel opened at 1135 North Railroad Avenue on October 19, 2026, with rates from $395, a rooftop pool and Stephen Starr's Pastis on the ground floor. WPTV reported the retail phase 71 percent leased earlier in the year. Nora House is the district's first for-sale condominium.

Public money is tied to the next steps. The city's redevelopment agency committed up to $20.83 million in reimbursements to the master developers, paid against milestones. The final payment of just over $2.33 million is due when multifamily vertical construction begins. The agency's disbursement records will show when that milestone is reached.

Taller neighbors are planned around Nora House West Palm Beach

An 11-story building in a growing district should expect company. CBS12 reported in October 2026 that the district's plan includes buildings of 12, 15 and 20 stories. WPTV described a 12-story rental building of 350 apartments, 52 of them affordable, and a later phase of 277 residences with 74,000 square feet of office space.

Those phases bear on the views the sales gallery describes. The official site promises skyline, Intracoastal and ocean views, but the building is inland of Flagler Drive and sits beside the FEC rail corridor. A taller neighbor to the east or south would change what a mid-floor residence sees.

The site plan settles the question. A buyer should ask for the approved district master plan, the height and location of each planned building and the residence's exposure. Construction on adjacent parcels may also run through the years after closing. The flood map is reassuring on one point: the parcel reads Zone X, outside the special flood hazard area.

Measure the residence the way the declaration does

The published sizes are not the legal sizes. The sales agent's development page gives residences of about 1,400 to just over 2,900 square feet, measured to exterior walls and wall centerlines. It states that these figures exceed the interior measurements used in the condominium documents. The official site lists 1,460 to 6,700 square feet in one place and 1,700 in another.

The larger figures include fourth-level residences with expanded terraces of up to 6,700 square feet in total. Price per square foot is only meaningful against the interior area in the declaration. The developer entity is Nora East 10-11 Owner LLC, and the association will be the Nora House Condominium Association.

The verification list is short. It covers the deposit schedule and the escrow agent, the construction legend and the outside completion date. It also covers the interior square footage of the chosen residence, the district site plan and the estimated operating budget. Each belongs in writing before the 15-day cancellation period ends.

Questions to put to the sales team

  • What is the deposit schedule at Nora House, and how much is due before groundbreaking?
  • Who is the escrow agent, and will deposits above 10 percent be used for construction?
  • Has a construction lender been engaged, and when is groundbreaking now expected?
  • What is the outside completion date in the purchase agreement, and what refund applies if it is missed?
  • What is the interior square footage of this residence as defined in the declaration?
  • Which Nora District buildings are planned east and south of Nora House, and how tall will they be?
  • What is the estimated monthly assessment in the prospectus budget?
  • How is noise from the FEC rail corridor handled in the building design?

For every new tower in South Florida with its figures, floor plans and sources, open the index.

Questions this article answers

What is the deposit schedule at Nora House West Palm Beach?

Nora House has not published a deposit schedule. It does not appear on the official site, the sales agent's development page or the March 2026 launch release. The schedule is set in the purchase agreement, so ask for the agreement and read the payment dates, the escrow agent and the construction legend before the 15-day cancellation period ends.

Are deposits at Nora House protected in escrow?

Yes, by Florida law. Section 718.202 requires the first 10 percent of the price in escrow and any excess in a special escrow account. The excess can be used for construction only after building begins and only if the contract says so in bold on its first page. A developer that fails to comply makes the contract voidable.

When will Nora House West Palm Beach break ground?

The developer anticipates groundbreaking in mid-2027 and completion in 2029. A WPTV report on the district's phases gave later dates, a late 2027 start and late 2029 completion. No construction loan had been announced in the sources reviewed in November 2026, so confirm the current target and the contract's outside completion date with the sales team.

How much do residences at Nora House cost?

The launch release quoted pricing from the upper $1 millions, and the official site reads from the low $2 millions. The sales director told WPTV in April 2026 that the top of the range reaches roughly $5 million to $6 million. The current price list comes from the sales gallery at 955 North Railroad Avenue.

Who is developing Nora House?

The Ronto Group of Naples leads Nora House with the Nora District's master developers: NDT Development, Place Projects and Wheelock Street Capital. Swedroe Architecture designed the building and Lillian Wu Studio the interiors. The developer entity named on the sales page is Nora East 10-11 Owner LLC.

What is open in the Nora District now?

The first phase converted century-old warehouses on North Railroad Avenue into more than 100,000 square feet of retail and over 55,000 square feet of office space. The 201-room Nora Hotel opened on October 19, 2026, with Pastis and Jack's Bar. Tenants include Le Labo, Warby Parker, solidcore and Celis Juice Bar.

Will taller buildings rise near Nora House?

The district plan reported by CBS12 in October 2026 includes buildings of 12, 15 and 20 stories, and Nora House has 11. WPTV described a 12-story rental building of 350 apartments and a later phase of 277 residences with office space. Ask for the approved site plan and the height of each building near the residence.

How big are the residences at Nora House?

Sales materials give about 1,400 to just over 2,900 square feet, with fourth-level terrace residences up to 6,700 square feet in total. The sales agent's page notes these figures are measured to exterior walls and centerlines, so they exceed the interior areas in the condominium documents. Compare prices against the declaration's interior figure.

Is Nora House in a flood zone?

No special flood hazard area applies. The FEMA flood map places the parcel in Zone X, minimal flood hazard. Nora House is not on the water: it sits in the Nora District between North Dixie Highway and the FEC railway, inland of Flagler Drive, with views of the skyline and, from upper floors, the Intracoastal.

How many residences does Nora House have, and how big are they?

Nora House has 117 residences over 11 stories, with residences of 1,460 to 6,700 square feet. 2- to 4-bedroom residences; expanded-terrace residences on level 4; pool-level penthouses.

Share

Schedule a private presentation

Select an option

Premier Listings, licensed Florida brokerEqual Housing Opportunity